- Year built
- 1959
- Residences
- 122
- Building area
- 123,386 sq ft
- Median residence
- 770 sq ft
- FEMA flood zone
- Zone AE · BFE 8 ft
- Latest arms-length sale
- $640,000 · Jan 2026
- Median sale (10 yr)
- $504,000
- Recorded transfers
- 564
The Executive is a 122-residence condominium building at 4925 Collins Avenue, in Mid-Beach, completed in 1959. It has a median residence of 770 square feet.
The recorded market runs to 335 arms-length sales since 1980, an annual turnover rate of 3.4 percent of the building over the past decade, and a median of $188 per square foot. Across 214 same-unit resales, 87 percent sold above their prior recorded price, with a median gain of 52 percent over a median hold of 8.4 years. The 14 sales since 2023 carry a median of $833 per square foot, against a record that opens in 1980 and spans several market cycles. Recorded deeds show 16 parties that acquired more than one residence in the building.
Recorded sales history
Recorded transfers for this building in Miami-Dade County public records, back to Feb 1980. Prices reflect the recorded consideration; transfers the Property Appraiser does not qualify as arms-length are shown unmarked. Nominal-consideration paper transfers (deeds into trusts and LLCs, estate and family transfers, corrective deeds) are part of the record but not sales, and are omitted from this table. Recording lags closing, so the newest sales can take several weeks to appear.
| Date | Residence | Size | Price | Arms-length |
|---|---|---|---|---|
| Jan 2026 | 8G | 1,283 sf | $640,000 | ✓ |
| Apr 2025 | CU8 | 151 sf | $200,000 | ✓ |
| Apr 2025 | 11F | 2,753 sf | $1,725,000 | ✓ |
| Mar 2025 | 2H | 770 sf | $500,000 | ✓ |
| Nov 2024 | CU25 | 151 sf | $714,000 | ✓ |
| Nov 2024 | CU1 | 151 sf | $953,000 | ✓ |
| Nov 2024 | 3G | 1,283 sf | $953,000 | ✓ |
| Nov 2024 | 3D | 694 sf | $714,000 | ✓ |
| Nov 2024 | 4G | 1,283 sf | $750,000 | ✓ |
| Jul 2024 | 11C | 670 sf | $580,000 | |
| Jan 2024 | 7B | 694 sf | $560,000 | ✓ |
| Aug 2023 | 5H | 770 sf | $508,000 | ✓ |
| Jul 2023 | 9C | 670 sf | $575,000 | ✓ |
| Apr 2023 | CU10 | 151 sf | $225,000 | ✓ |
| Apr 2023 | CU12 | 302 sf | $450,000 | ✓ |
| May 2022 | 1B | 1,253 sf | $700,000 | |
| Feb 2022 | 7J | 1,470 sf | $635,000 | ✓ |
| Nov 2021 | 2H | 770 sf | $340,000 | ✓ |
| Jun 2021 | 7A | 1,757 sf | $1,337,000 | ✓ |
| Feb 2021 | 11C | 670 sf | $549,000 | ✓ |
| Dec 2020 | CU14 | 151 sf | $225,000 | ✓ |
| Dec 2020 | 12F | 1,470 sf | $525,000 | |
| Jul 2020 | CU17 | 151 sf | $245,000 | ✓ |
| Apr 2020 | 5D | 694 sf | $517,000 | ✓ |
| Mar 2020 | 2G | 1,283 sf | $480,000 | ✓ |
| Mar 2020 | 10A | 1,757 sf | $1,050,000 | ✓ |
| Dec 2019 | 6B | 694 sf | $450,000 | ✓ |
| Sep 2019 | CU20 | 151 sf | $100,000 | |
| Aug 2019 | 10F | 1,470 sf | $625,000 | ✓ |
| Apr 2019 | 2J | 1,470 sf | $525,000 | ✓ |
| Mar 2019 | 5C | 670 sf | $430,000 | ✓ |
| Feb 2019 | 5J | 1,470 sf | $700,000 | ✓ |
| Jan 2019 | 5H | 770 sf | $425,000 | ✓ |
| Jan 2019 | 6B | 694 sf | $441,000 | |
| Jan 2019 | CU17 | 151 sf | $180,000 | ✓ |
| Apr 2018 | 6J | 1,470 sf | $500,000 | ✓ |
| Mar 2018 | 9G | 1,283 sf | $470,000 | ✓ |
| Mar 2018 | CU1 | 151 sf | $125,000 | |
| Mar 2018 | CU6 | 151 sf | $125,000 | |
| Feb 2018 | CU25 | 151 sf | $125,000 | ✓ |
| Feb 2018 | 5J | 1,470 sf | $675,000 | ✓ |
| Feb 2018 | 3F | 1,470 sf | $515,000 | ✓ |
| Jun 2017 | 3D | 694 sf | $440,000 | ✓ |
| Apr 2017 | 7H | 770 sf | $441,500 | ✓ |
| Mar 2017 | CU10 | 151 sf | $587,500 | ✓ |
| Jan 2017 | 9C | 670 sf | $445,000 | ✓ |
| Sep 2016 | CU25 | 151 sf | $100,000 | ✓ |
| Sep 2016 | 5J | 1,470 sf | $650,000 | ✓ |
| Jul 2016 | CU1 | 151 sf | $100,000 | ✓ |
| Jul 2016 | 12D | 694 sf | $400,000 | ✓ |
| Jun 2016 | 4G | 1,283 sf | $515,000 | ✓ |
| Jun 2016 | 7J | 1,470 sf | $605,000 | ✓ |
| Jun 2016 | 8B | 694 sf | $430,000 | ✓ |
| Apr 2016 | 8B | 694 sf | $400,000 | ✓ |
| Mar 2016 | 11C | 670 sf | $415,000 | ✓ |
| Nov 2015 | 3H | 770 sf | $300,000 | ✓ |
| Oct 2015 | 9C | 670 sf | $408,000 | ✓ |
| Jul 2015 | 3G | 1,283 sf | $423,000 | ✓ |
| Jun 2015 | 4A | 1,757 sf | $1,100,000 | ✓ |
| Mar 2015 | 11J | 2,240 sf | $735,000 | ✓ |
| Dec 2014 | 12H | 770 sf | $365,000 | ✓ |
| Dec 2014 | 7G | 1,283 sf | $575,000 | ✓ |
| Dec 2014 | 6F | 1,470 sf | $549,000 | ✓ |
| Oct 2014 | 5H | 770 sf | $290,000 | ✓ |
| May 2014 | 12-B | 694 sf | $310,000 | ✓ |
| Mar 2014 | 3C | 1,364 sf | $310,000 | ✓ |
| Feb 2014 | 9A | 1,757 sf | $925,000 | ✓ |
| Feb 2014 | 7H | 770 sf | $275,000 | ✓ |
| Jan 2014 | 11A | 1,757 sf | $845,000 | ✓ |
| Jan 2014 | 9A | 1,757 sf | $925,000 | ✓ |
| Dec 2013 | 3A | 1,757 sf | $700,000 | ✓ |
| Nov 2013 | CU5 | 151 sf | $535,000 | ✓ |
| Nov 2013 | 8J | 1,470 sf | $535,000 | ✓ |
| Sep 2013 | CU24 | 151 sf | $75,000 | ✓ |
| Jul 2013 | 5B | 694 sf | $295,000 | ✓ |
| May 2013 | 5C | 670 sf | $295,000 | ✓ |
| Apr 2013 | CU24 | 151 sf | $70,000 | ✓ |
| Apr 2013 | 10F | 1,470 sf | $482,500 | ✓ |
| Apr 2013 | 5B | 694 sf | $183,400 | |
| Apr 2013 | 7A | 1,757 sf | $820,000 | ✓ |
| Jan 2013 | 7G | 1,283 sf | $362,000 | ✓ |
| Dec 2012 | 10A | 1,757 sf | $615,000 | ✓ |
| Nov 2012 | CU12 | 302 sf | $62,500 | ✓ |
| Nov 2012 | 12-B | 694 sf | $41,750 | ✓ |
| Nov 2012 | 6A | 1,757 sf | $617,500 | ✓ |
| Oct 2012 | 9B | 694 sf | $269,900 | ✓ |
| Sep 2012 | 9J | 1,470 sf | $268,000 | ✓ |
| Sep 2012 | 12G | 1,283 sf | $367,000 | ✓ |
| Aug 2012 | 10B | 694 sf | $225,000 | ✓ |
| Jun 2012 | CU21 | 151 sf | $58,000 | ✓ |
| Jun 2012 | 10G | 1,283 sf | $380,000 | ✓ |
| Apr 2012 | 2F | 1,470 sf | $300,000 | ✓ |
| Apr 2012 | 5A | 1,757 sf | $560,000 | ✓ |
| Mar 2012 | CU6 | 151 sf | $40,000 | ✓ |
| Dec 2011 | 2G | 1,283 sf | $260,000 | ✓ |
| Dec 2011 | 12H | 770 sf | $57,200 | |
| Jun 2011 | CU24 | 151 sf | $46,000 | ✓ |
| May 2011 | 4H | 770 sf | $150,000 | ✓ |
| Mar 2011 | CU15 | 151 sf | $80,000 | ✓ |
| Feb 2011 | CU1 | 151 sf | $24,000 | |
| Feb 2011 | 12J | 1,470 sf | $360,000 | ✓ |
| Feb 2011 | 12D | 694 sf | $141,000 | |
| Dec 2010 | 11F | 2,753 sf | $360,000 | |
| Sep 2010 | 6E | 1,760 sf | $96,670 | |
| Jun 2010 | CU22 | 151 sf | $200,000 | ✓ |
| Jun 2010 | 10D | 694 sf | $200,000 | ✓ |
| Apr 2010 | 12C | 670 sf | $189,000 | ✓ |
| Mar 2010 | 10H | 770 sf | $325,000 | ✓ |
| Feb 2010 | 10A | 1,757 sf | $522,500 | ✓ |
| Feb 2010 | 4G | 1,283 sf | $270,000 | ✓ |
| Oct 2009 | CU21 | 151 sf | $42,000 | ✓ |
| Aug 2009 | CU25 | 151 sf | $22,000 | ✓ |
| Jun 2009 | CU6 | 151 sf | $470,000 | ✓ |
| Jun 2009 | 5A | 1,757 sf | $470,000 | ✓ |
| May 2009 | 4E | 1,760 sf | $380,000 | ✓ |
| Mar 2009 | CAB11 | 151 sf | $216,000 | |
| Mar 2009 | 5D | 694 sf | $216,000 | |
| Feb 2009 | 3J | 1,470 sf | $191,300 | |
| Jan 2009 | 3J | 1,470 sf | $175,000 | |
| Aug 2008 | 8G | 1,283 sf | $300,000 | ✓ |
| May 2008 | 5E | 1,760 sf | $465,000 | ✓ |
| Apr 2008 | 4G | 1,283 sf | $230,000 | ✓ |
| Apr 2008 | 1B | 1,253 sf | $220,000 | ✓ |
| Mar 2008 | 12-B | 694 sf | $30,000 | |
| Mar 2008 | CU18 | 151 sf | $48,000 | ✓ |
| Feb 2008 | 5B | 694 sf | $225,000 | ✓ |
| Dec 2007 | 12H | 770 sf | $220,000 | ✓ |
| Dec 2007 | 7A | 1,757 sf | $632,610 | ✓ |
| Oct 2007 | 9F | 1,470 sf | $240,000 | ✓ |
| Oct 2007 | 10A | 1,757 sf | $495,000 | ✓ |
| Jun 2007 | CU28 | 151 sf | $47,500 | ✓ |
| May 2007 | CU21 | 151 sf | $45,000 | ✓ |
| Sep 2006 | CU16 | 151 sf | $50,000 | ✓ |
| Aug 2006 | 5J | 1,470 sf | $365,000 | ✓ |
| May 2006 | 10J | 1,470 sf | $450,000 | ✓ |
| Apr 2006 | 12G | 1,283 sf | $350,000 | ✓ |
| Mar 2006 | 3J | 1,470 sf | $515,000 | ✓ |
| Feb 2006 | 5H | 770 sf | $240,000 | ✓ |
| Oct 2005 | 9B | 694 sf | $235,000 | ✓ |
| Oct 2005 | 9A | 1,757 sf | $705,000 | ✓ |
| Jul 2005 | 9E | 1,760 sf | $690,000 | ✓ |
| Apr 2005 | 8A | 1,757 sf | $490,125 | ✓ |
| Mar 2005 | 8C | 670 sf | $200,000 | ✓ |
| Jan 2005 | CU8 | 151 sf | $36,919 | ✓ |
| Dec 2004 | CU19 | 151 sf | $50,000 | ✓ |
| Dec 2004 | 3H | 770 sf | $207,000 | ✓ |
| Dec 2004 | 11E | 1,760 sf | $400,000 | ✓ |
| Sep 2004 | 2G | 1,283 sf | $318,000 | ✓ |
| Sep 2004 | 4D | 694 sf | $215,000 | ✓ |
| Sep 2004 | 1B | 1,253 sf | $215,000 | ✓ |
| Jul 2004 | 8A | 1,757 sf | $430,000 | ✓ |
| Jun 2004 | 6J | 1,470 sf | $285,000 | ✓ |
| May 2004 | CU12 | 302 sf | $475,300 | ✓ |
| May 2004 | 7A | 1,757 sf | $365,000 | ✓ |
| May 2004 | 6A | 1,757 sf | $475,300 | ✓ |
| Apr 2004 | CU18 | 151 sf | $42,000 | ✓ |
| Apr 2004 | 5C | 670 sf | $195,000 | ✓ |
| Mar 2004 | 12E | 1,760 sf | $452,000 | ✓ |
| Mar 2004 | 3C | 1,364 sf | $178,500 | ✓ |
| Feb 2004 | 6H | 770 sf | $145,000 | ✓ |
| Feb 2004 | 11F | 2,753 sf | $257,400 | ✓ |
| Jan 2004 | CU20 | 151 sf | $40,000 | ✓ |
| Dec 2003 | 10G | 1,283 sf | $245,000 | ✓ |
| Dec 2003 | 9D | 694 sf | $179,000 | ✓ |
| Dec 2003 | 10C | 670 sf | $197,500 | ✓ |
| Oct 2003 | 2G | 1,283 sf | $280,000 | ✓ |
| Aug 2003 | 12-B | 694 sf | $210,000 | ✓ |
| Jul 2003 | 10D | 694 sf | $204,000 | |
| Jul 2003 | 3D | 694 sf | $150,000 | ✓ |
| Jun 2003 | CU9 | 151 sf | $205,000 | ✓ |
| Jun 2003 | 6D | 694 sf | $205,000 | ✓ |
| May 2003 | 6E | 1,760 sf | $470,000 | ✓ |
| May 2003 | 5C | 670 sf | $164,000 | ✓ |
| Apr 2003 | CU22 | 151 sf | $20,000 | ✓ |
| Nov 2002 | CU7 | 151 sf | $445,000 | ✓ |
| Nov 2002 | 9E | 1,760 sf | $445,000 | ✓ |
| Oct 2002 | CU5 | 151 sf | $263,500 | ✓ |
| Oct 2002 | 12J | 1,470 sf | $235,000 | ✓ |
| Oct 2002 | 8J | 1,470 sf | $263,500 | ✓ |
| Oct 2002 | 5C | 670 sf | $126,000 | ✓ |
| Aug 2002 | 8F | 1,470 sf | $220,000 | ✓ |
| Apr 2002 | 7F | 1,470 sf | $240,000 | ✓ |
| Mar 2002 | CU21 | 151 sf | $145,000 | ✓ |
| Mar 2002 | CU3 | 151 sf | $25,000 | ✓ |
| Mar 2002 | 4H | 770 sf | $145,000 | ✓ |
| Mar 2002 | 9C | 670 sf | $135,000 | ✓ |
| Mar 2002 | 4A | 1,757 sf | $315,000 | ✓ |
| Jan 2002 | 5C | 670 sf | $126,000 | ✓ |
| May 2001 | CU20 | 151 sf | $37,000 | ✓ |
| Apr 2001 | CU1 | 151 sf | $23,000 | ✓ |
| Apr 2001 | 12D | 694 sf | $175,000 | ✓ |
| Mar 2001 | 12E | 1,760 sf | $300,000 | ✓ |
| Feb 2001 | 7B | 694 sf | $105,000 | ✓ |
| Jan 2001 | CU4 | 151 sf | $17,500 | ✓ |
| Aug 2000 | 11C | 670 sf | $108,000 | ✓ |
| Jul 2000 | 10H | 770 sf | $118,000 | ✓ |
| Jul 2000 | 8H | 770 sf | $110,000 | ✓ |
| May 2000 | 9B | 694 sf | $345,000 | ✓ |
| May 2000 | 9A | 1,757 sf | $345,000 | ✓ |
| Apr 2000 | 6B | 694 sf | $80,000 | ✓ |
| Mar 2000 | CU1 | 151 sf | $25,000 | ✓ |
| Mar 2000 | 10F | 1,470 sf | $295,000 | ✓ |
| Mar 2000 | 7B | 694 sf | $105,000 | ✓ |
| Feb 2000 | 10D | 694 sf | $119,900 | ✓ |
| Dec 1999 | CU24 | 151 sf | $120,000 | ✓ |
| Dec 1999 | 8F | 1,470 sf | $150,000 | ✓ |
| Oct 1999 | CU10 | 151 sf | $35,000 | ✓ |
| Oct 1999 | 11J | 2,240 sf | $130,000 | |
| Oct 1999 | 11D | 694 sf | $130,000 | ✓ |
| Jun 1999 | 12G | 1,283 sf | $147,500 | ✓ |
| Jun 1999 | 9D | 694 sf | $125,000 | ✓ |
| May 1999 | 6E | 1,760 sf | $222,000 | ✓ |
| Apr 1999 | CU9 | 151 sf | $25,000 | ✓ |
| Nov 1998 | 7G | 1,283 sf | $160,000 | ✓ |
| Jul 1998 | 2G | 1,283 sf | $169,000 | ✓ |
| Jul 1998 | 9D | 694 sf | $110,000 | ✓ |
| May 1998 | 4F | 1,470 sf | $129,000 | ✓ |
| May 1998 | 12E | 1,760 sf | $200,000 | ✓ |
| May 1998 | 12D | 694 sf | $200,000 | ✓ |
| May 1998 | 12D | 694 sf | $105,000 | ✓ |
| Apr 1998 | 7E | 1,760 sf | $270,000 | ✓ |
| Oct 1997 | 12C | 670 sf | $98,400 | ✓ |
| Jun 1997 | 10G | 1,283 sf | $142,000 | ✓ |
| Jun 1997 | 5D | 694 sf | $85,000 | ✓ |
| Mar 1997 | 9G | 1,283 sf | $155,000 | ✓ |
| Jan 1997 | 7F | 1,470 sf | $155,000 | ✓ |
| Aug 1996 | 7D | 694 sf | $60,000 | |
| May 1996 | 12-B | 694 sf | $75,000 | ✓ |
| Apr 1996 | 5J | 1,470 sf | $180,000 | ✓ |
| Mar 1996 | 12G | 1,283 sf | $120,000 | ✓ |
| Mar 1996 | 8G | 1,283 sf | $128,100 | ✓ |
| Mar 1996 | 8C | 670 sf | $100,000 | ✓ |
| Dec 1995 | 7G | 1,283 sf | $130,000 | ✓ |
| Nov 1995 | 1B | 1,253 sf | $80,000 | ✓ |
| Oct 1995 | CU10 | 151 sf | $34,000 | ✓ |
| Oct 1995 | 10A | 1,757 sf | $225,000 | ✓ |
| Jun 1995 | CU27 | 151 sf | $25,000 | ✓ |
| Jun 1995 | 7J | 1,470 sf | $137,500 | ✓ |
| Jun 1995 | 11A | 1,757 sf | $189,000 | ✓ |
| Apr 1995 | 12-B | 694 sf | $95,000 | ✓ |
| Mar 1995 | 5D | 694 sf | $83,500 | ✓ |
| Nov 1994 | 8D | 694 sf | $80,800 | ✓ |
| Oct 1994 | 12-B | 694 sf | $76,500 | ✓ |
| Jul 1994 | 10H | 770 sf | $95,000 | ✓ |
| Jun 1994 | 3H | 770 sf | $87,000 | ✓ |
| Jun 1994 | 10B | 694 sf | $87,000 | ✓ |
| Dec 1993 | 10F | 1,470 sf | $92,300 | |
| Dec 1993 | 10E | 1,760 sf | $220,000 | ✓ |
| Oct 1993 | 12C | 670 sf | $95,000 | ✓ |
| Oct 1993 | 10C | 670 sf | $85,300 | ✓ |
| Apr 1993 | CU5 | 151 sf | $22,500 | ✓ |
| Dec 1992 | 6D | 694 sf | $93,000 | ✓ |
| Nov 1992 | 2F | 1,470 sf | $92,500 | ✓ |
| Oct 1992 | 12-A | 1,757 sf | $210,000 | ✓ |
| Jul 1992 | 10D | 694 sf | $82,500 | ✓ |
| Apr 1992 | 10C | 670 sf | $73,000 | ✓ |
| Apr 1992 | 4C | 670 sf | $69,000 | ✓ |
| Mar 1992 | 9G | 1,283 sf | $125,000 | ✓ |
| Mar 1992 | 5D | 694 sf | $77,000 | ✓ |
| Mar 1992 | 12C | 670 sf | $85,000 | ✓ |
| Nov 1991 | 11D | 694 sf | $82,000 | ✓ |
| Oct 1991 | 3J | 1,470 sf | $98,000 | ✓ |
| Sep 1991 | 12J | 1,470 sf | $120,000 | ✓ |
| Sep 1991 | 12F | 1,470 sf | $130,000 | ✓ |
| Aug 1991 | 10B | 694 sf | $67,000 | |
| Jun 1991 | 2D | 694 sf | $77,000 | ✓ |
| Apr 1991 | 7H | 770 sf | $67,000 | ✓ |
| Apr 1991 | 8E | 1,760 sf | $191,000 | ✓ |
| Mar 1991 | 7C | 1,240 sf | $75,000 | ✓ |
| Nov 1990 | CU1 | 151 sf | $22,000 | ✓ |
| Jun 1990 | 5J | 1,470 sf | $135,000 | ✓ |
| Jun 1990 | 7G | 1,283 sf | $150,000 | ✓ |
| Jun 1990 | 3D | 694 sf | $76,000 | ✓ |
| Jan 1990 | 11E | 1,760 sf | $251,000 | |
| Jan 1990 | 7B | 694 sf | $75,000 | ✓ |
| Dec 1989 | 4G | 1,283 sf | $100,000 | ✓ |
| Dec 1989 | 6E | 1,760 sf | $195,000 | ✓ |
| Nov 1989 | 9C | 670 sf | $115,000 | ✓ |
| Jul 1989 | 9D | 694 sf | $70,000 | ✓ |
| Jul 1989 | 4D | 694 sf | $67,000 | ✓ |
| Jun 1989 | 7E | 1,760 sf | $200,791 | ✓ |
| Jun 1989 | 10B | 694 sf | $58,500 | ✓ |
| May 1989 | 12D | 694 sf | $60,000 | ✓ |
| Mar 1989 | 7G | 1,283 sf | $110,000 | ✓ |
| Mar 1989 | 7B | 694 sf | $59,900 | ✓ |
| Dec 1988 | 3A | 1,757 sf | $135,000 | ✓ |
| Nov 1988 | 4-J | 1,470 sf | $70,000 | ✓ |
| Sep 1988 | CU27 | 151 sf | $185,000 | ✓ |
| Sep 1988 | 11A | 1,757 sf | $185,000 | ✓ |
| Aug 1988 | 3D | 694 sf | $57,000 | ✓ |
| Aug 1988 | 5C | 670 sf | $55,000 | ✓ |
| Jul 1988 | 6B | 694 sf | $53,500 | ✓ |
| Jun 1988 | 12-A | 1,757 sf | $156,700 | ✓ |
| May 1988 | 11E | 1,760 sf | $165,000 | ✓ |
| Apr 1988 | 8C | 670 sf | $90,000 | ✓ |
| Mar 1988 | 9C | 670 sf | $57,000 | ✓ |
| Nov 1987 | 3G | 1,283 sf | $65,000 | |
| Oct 1987 | 3F | 1,470 sf | $73,500 | |
| Sep 1987 | 2J | 1,470 sf | $75,000 | |
| Sep 1987 | 10H | 770 sf | $52,000 | |
| Jul 1987 | CU19 | 151 sf | $29,600 | |
| Jul 1987 | 4-J | 1,470 sf | $79,000 | |
| Jul 1987 | 4F | 1,470 sf | $90,500 | |
| Jul 1987 | 9B | 694 sf | $50,000 | |
| Jun 1987 | 8G | 1,283 sf | $76,300 | |
| May 1987 | 4D | 694 sf | $61,000 | ✓ |
| Mar 1987 | 2G | 1,283 sf | $95,000 | |
| Feb 1987 | 8H | 770 sf | $53,000 | |
| Feb 1987 | 7B | 694 sf | $49,500 | |
| Jan 1987 | CU18 | 151 sf | $20,000 | |
| Dec 1986 | CU15 | 151 sf | $30,000 | |
| Dec 1986 | CU9 | 151 sf | $13,000 | ✓ |
| Dec 1986 | 7J | 1,470 sf | $101,100 | ✓ |
| Dec 1986 | 5E | 1,760 sf | $67,500 | |
| Nov 1986 | CU25 | 151 sf | $72,300 | ✓ |
| Nov 1986 | 8H | 770 sf | $72,300 | ✓ |
| May 1986 | 2B | 3,121 sf | $130,000 | |
| Feb 1986 | 6E | 1,760 sf | $105,000 | |
| Sep 1985 | 4G | 1,283 sf | $85,000 | |
| Aug 1985 | CU8 | 151 sf | $12,500 | ✓ |
| Jul 1985 | 9J | 1,470 sf | $76,000 | |
| Jul 1985 | 9F | 1,470 sf | $95,500 | ✓ |
| Jul 1985 | 7E | 1,760 sf | $107,000 | |
| Jun 1985 | 12D | 694 sf | $53,400 | |
| May 1985 | 1A | 1,757 sf | $110,500 | |
| Apr 1985 | 8D | 694 sf | $42,500 | |
| Mar 1985 | 9J | 1,470 sf | $147,400 | ✓ |
| Mar 1985 | 5H | 770 sf | $48,500 | |
| Feb 1985 | CU2 | 151 sf | $120,000 | ✓ |
| Feb 1985 | 11B | 694 sf | $57,000 | ✓ |
| Feb 1985 | 1A | 1,757 sf | $120,000 | ✓ |
| Jan 1985 | 7E | 1,760 sf | $140,300 | ✓ |
| Dec 1984 | 4D | 694 sf | $46,000 | ✓ |
| Nov 1984 | 9H | 770 sf | $58,000 | ✓ |
| Oct 1984 | 12F | 1,470 sf | $82,000 | |
| Oct 1984 | 2D | 694 sf | $75,000 | ✓ |
| Sep 1984 | 4E | 1,760 sf | $137,000 | ✓ |
| Aug 1984 | 10B | 694 sf | $53,500 | |
| Aug 1984 | 7A | 1,757 sf | $137,500 | ✓ |
| May 1984 | CU3 | 151 sf | $157,000 | ✓ |
| May 1984 | 8B | 694 sf | $45,000 | |
| May 1984 | 9A | 1,757 sf | $157,000 | ✓ |
| Dec 1983 | 6G | 1,283 sf | $150,000 | ✓ |
| Oct 1983 | CU17 | 151 sf | $12,000 | ✓ |
| Jul 1983 | CU6 | 151 sf | $175,000 | ✓ |
| Jul 1983 | 8D | 694 sf | $64,200 | ✓ |
| Jul 1983 | 5A | 1,757 sf | $175,000 | ✓ |
| Jun 1983 | 6J | 1,470 sf | $140,000 | ✓ |
| Jun 1983 | 6J | 1,470 sf | $150,000 | ✓ |
| Jun 1983 | 1B | 1,253 sf | $90,000 | ✓ |
| Jan 1983 | CU4 | 151 sf | $10,000 | ✓ |
| Jan 1983 | 7D | 694 sf | $65,000 | ✓ |
| Jan 1983 | 8A | 1,757 sf | $110,000 | ✓ |
| Sep 1982 | 6J | 1,470 sf | $120,000 | ✓ |
| Aug 1982 | 4H | 770 sf | $73,000 | ✓ |
| Jul 1982 | CU7 | 151 sf | $182,200 | ✓ |
| Jul 1982 | 9E | 1,760 sf | $182,200 | ✓ |
| Dec 1981 | 5C | 670 sf | $90,000 | ✓ |
| Nov 1981 | 3D | 694 sf | $84,000 | ✓ |
| Dec 1980 | CU12 | 302 sf | $15,000 | ✓ |
| Aug 1980 | 2H | 770 sf | $82,200 | ✓ |
| Aug 1980 | 12F | 1,470 sf | $163,100 | ✓ |
| Aug 1980 | 5F | 1,470 sf | $167,700 | ✓ |
| Aug 1980 | 12D | 694 sf | $86,900 | ✓ |
| Aug 1980 | 12-A | 1,757 sf | $200,200 | ✓ |
| Feb 1980 | CU19 | 151 sf | $10,000 | ✓ |
| Feb 1980 | CU18 | 151 sf | $10,000 | ✓ |
| Feb 1980 | CU15 | 151 sf | $10,000 | ✓ |
| Feb 1980 | CU14 | 151 sf | $11,000 | ✓ |
| Feb 1980 | CU9 | 151 sf | $10,000 | ✓ |
| Feb 1980 | 8J | 1,470 sf | $156,100 | ✓ |
| Feb 1980 | 11F | 2,753 sf | $156,100 | ✓ |
| Feb 1980 | 10F | 1,470 sf | $159,600 | ✓ |
| Feb 1980 | 8F | 1,470 sf | $155,200 | ✓ |
| Feb 1980 | 7F | 1,470 sf | $153,700 | ✓ |
| Feb 1980 | 6F | 1,470 sf | $154,600 | ✓ |
| Feb 1980 | 2F | 1,470 sf | $152,200 | ✓ |
| Feb 1980 | 12E | 1,760 sf | $197,200 | ✓ |
| Feb 1980 | 10E | 1,760 sf | $201,800 | ✓ |
| Feb 1980 | 7E | 1,760 sf | $195,100 | ✓ |
| Feb 1980 | 4E | 1,760 sf | $193,900 | ✓ |
| Feb 1980 | 3E | 1,760 sf | $192,000 | ✓ |
| Feb 1980 | 2E | 1,760 sf | $193,100 | ✓ |
| Feb 1980 | 4C | 670 sf | $85,200 | ✓ |
| Feb 1980 | 3C | 1,364 sf | $83,000 | ✓ |
| Feb 1980 | 2B | 3,121 sf | $70,200 | ✓ |
✓ = qualified arms-length per the Miami-Dade Property Appraiser. 178 nominal-consideration paper transfers omitted.
Considering a move at The Executive?
Request a private building brief with the relevant recorded sales, current and off-market availability, and an apartment-specific view of value.
Building facts and sales records are compiled from Miami-Dade County public records (Property Appraiser) and reviewed against recognized architectural references. Figures are reported as recorded and may be updated as the county updates its records. This page is informational and is not an offer, solicitation, or valuation.