Mar-azul
600 Grapetree Drive, Key Biscayne, FL 33149
Folio 2452040110001
- Year built
- 1974
- Residences
- 127
- Building area
- 265,825 sq ft
- Median residence
- 2,052 sq ft
- FEMA flood zone
- Zone AE · BFE 8 ft
- Latest arms-length sale
- $1,700,000 · Jun 2026
- Median sale (10 yr)
- $1,270,000
- Recorded transfers
- 679
Mar-azul is a 127-residence condominium building at 600 Grapetree Drive, on Key Biscayne. County records list 1974 as the year built. It has a median residence of 2,052 square feet.
The recorded market runs to 479 arms-length sales since 1974, an annual turnover rate of 3.3 percent of the building over the past decade, and a median of $164 per square foot. Across 348 same-unit resales, 91 percent sold above their prior recorded price, with a median gain of 61 percent over a median hold of 7.6 years. The 8 sales since 2023 carry a median of $911 per square foot, against a record that opens in 1974 and spans several market cycles.
Own a residence at Mar-azul? See what it would sell for.
Choose what fits: a property-specific pricing review informed by local transaction records and market research, a conversation about buying in this market, or help planning a move between markets. Local representation is coordinated where appropriate.
646.939.7375 · c.cohen@compass.com
At a glance
Building type: Oceanfront condominium, 11 stories, with elevator service
Floors: 11
Residences: 126, per the state condominium registration. The county record counts 127 units.
Unit sizes: About 1,670 to 3,711 square feet, in two- and three-bedroom plans.
Beach access: Oceanfront, with beach access
Amenities: Heated pool, exercise room, clubhouse and community room, barbecue and picnic area, bike room, concierge, assigned covered parking and guest parking
Source: The Roebling Research Desk.
Why Mar-Azul matters
Mar-Azul has two- and three-bedroom residences of roughly 1,700 to 3,700 square feet, in a building of 126 units.
The location is the other reason. Grapetree Drive runs along the ocean side of Key Biscayne, and the building sits directly on the beach. Bill Baggs Cape Florida State Park, with its lighthouse and beaches, is at the south end of the island, and Crandon Park is to the north. Reaching the mainland means the Rickenbacker Causeway.
Key Biscayne
Key Biscayne is a barrier island south of Virginia Key, reached by the Rickenbacker Causeway across the bay. The village of Key Biscayne is in the middle of the island, with a main street of shops, groceries and restaurants; a county park holds the northern end and a state park the southern. Oceanfront condominium buildings line the east side and single-family streets run inland.
Mar-Azul has beach access from the building. Downtown Miami and Brickell are a drive across the causeway.
Architecture and unit composition
The building is 11 stories with a traditional elevator-served layout. Residences are two- and three-bedroom plans. Sizes run from about 1,670 to 3,711 square feet.
Inspect each unit for renovation status.
Building operations
Amenities are a heated pool, an exercise room, a clubhouse and community room, a barbecue and picnic area, a bike room, covered assigned parking and guest parking. The building has a concierge desk.
Florida's milestone inspection and structural integrity reserve study rules apply to condominium buildings of three or more stories, and this building has 11; ask for the inspection report, the reserve study and any assessment history. Also ask for the reserve balance, any special assessments and a list of completed capital work, especially the roof, windows, balconies and concrete restoration.
Policy framework
Pet, rental and minimum-lease rules are set by the association; confirm at offer stage.
Sales context
One recorded sale, June 2026, at $1,700,000. It is one sale, not a building price.
Unit-level transaction history is maintained in The Roebling Research Library and shared with clients during diligence.
What to know if you're buying at Mar-Azul
Check the condition of the unit and the building. Ask what has been renovated, and get the capital reserves and any assessment history.
Check unit area. Get the floor plan.
Get the association's fee detail. Ask what the monthly charge covers and how it is set per unit.
What to know if you're selling at Mar-Azul
Document the renovation. Permits and finish detail support the renovation.
Have the building documents ready. Budget, reserve study, financials and inspection report shorten diligence.
Comparable buildings
- Towers of Key Biscayne — a Key Biscayne condominium.
- Oceana Key Biscayne — an oceanfront condominium on the island.
- The Pyramids Key Biscayne — a Key Biscayne condominium.
Compared with
- Bahia Mar of Key Biscayne, Key Biscayne
- Colonnade Bay, North Beach
- Grapetree Townhouse, Key Biscayne
The neighborhood
For the full neighborhood — its buildings and recorded pricing — read The Roebling Index guide to Key Biscayne.
Run the numbers
- Miami buyer closing cost calculator — documentary stamps on the mortgage, intangible tax, title insurance and the condo estoppel.
- Miami seller closing cost calculator — the deed documentary stamp tax, title, closing and association transfer fees.
Related guides
- Post-Surfside Miami condo diligence — milestone inspections, structural integrity reserve studies and special assessments.
- Florida Save Our Homes, explained — the assessment cap, the homestead exemption and portability.
Recorded sales history
Recorded transfers for this building in Miami-Dade County public records, back to Dec 1974. Prices reflect the recorded consideration; transfers the Property Appraiser does not qualify as arms-length are shown unmarked. Nominal-consideration paper transfers (deeds into trusts and LLCs, estate and family transfers, corrective deeds) are part of the record but not sales, and are omitted from this table. Recording lags closing, so the newest sales can take several weeks to appear.
| Date | Residence | Size | Price | Arms-length |
|---|---|---|---|---|
| Jun 2026 | 3DS | 1,889 sf | $1,700,000 | ✓ |
| Apr 2026 | 9FS | 1,670 sf | $800,000 | |
| Oct 2025 | 4BS | 2,523 sf | $975,000 | |
| Jul 2025 | 10GN | 1,670 sf | $1,450,000 | ✓ |
| Feb 2025 | 5ES | 2,281 sf | $600,000 | |
| Jul 2024 | 10CN | 2,366 sf | $2,350,000 | ✓ |
| Jun 2024 | 4GN | 1,670 sf | $1,470,000 | ✓ |
| Nov 2023 | 5ES | 2,281 sf | $2,400,000 | ✓ |
| Oct 2023 | 11ES | 2,281 sf | $2,000,000 | ✓ |
| Sep 2023 | 10FN | 1,670 sf | $1,540,000 | ✓ |
| Jul 2023 | 10BN | 2,523 sf | $2,500,000 | ✓ |
| May 2023 | 4BN | 2,523 sf | $1,866,000 | |
| Mar 2022 | 11GN | 3,340 sf | $3,450,000 | ✓ |
| Feb 2022 | 3DN | 1,889 sf | $1,550,000 | ✓ |
| Feb 2022 | B | 550 sf | $600,000 | ✓ |
| Feb 2022 | 5ES | 2,281 sf | $1,120,000 | |
| Dec 2021 | 6DN | 1,889 sf | $1,700,000 | ✓ |
| Dec 2021 | 10GN | 1,670 sf | $1,120,000 | ✓ |
| Oct 2021 | 4DN | 1,889 sf | $1,560,000 | ✓ |
| Sep 2021 | 8BS | 2,523 sf | $2,100,000 | ✓ |
| Jul 2021 | 11B-N | 3,711 sf | $2,995,000 | ✓ |
| Jul 2021 | 10DS | 1,889 sf | $910,000 | ✓ |
| Jun 2021 | 3FN | 1,670 sf | $760,000 | ✓ |
| Jun 2021 | 6CS | 2,366 sf | $1,150,000 | |
| Jun 2021 | 10GS | 1,670 sf | $885,000 | ✓ |
| Jun 2021 | 5BS | 2,523 sf | $1,350,000 | ✓ |
| Jun 2021 | C | 510 sf | $570,000 | ✓ |
| Jun 2021 | 4CN | 2,366 sf | $2,500,000 | ✓ |
| Apr 2021 | 9AN | 2,052 sf | $1,450,000 | ✓ |
| Mar 2021 | 6DS | 1,889 sf | $1,020,000 | ✓ |
| Mar 2021 | 11AS | 2,052 sf | $1,355,000 | ✓ |
| Feb 2021 | 3CN | 2,366 sf | $899,000 | ✓ |
| Feb 2021 | 8AS | 2,052 sf | $1,250,000 | ✓ |
| Jan 2021 | 7FN | 1,888 sf | $890,000 | ✓ |
| Aug 2020 | 4CN | 2,366 sf | $1,290,000 | ✓ |
| Aug 2020 | 11CN | 2,366 sf | $1,200,000 | ✓ |
| Aug 2020 | 3GN | 1,670 sf | $670,000 | ✓ |
| Jul 2020 | B | 112 sf | $30,500 | |
| Jun 2020 | 5GN | 1,670 sf | $650,000 | ✓ |
| Mar 2020 | 3AS | 2,052 sf | $1,250,000 | ✓ |
| Feb 2020 | 11AS | 2,052 sf | $1,100,000 | ✓ |
| Nov 2019 | 3DS | 1,889 sf | $669,000 | |
| Oct 2019 | 9ES | 2,281 sf | $788,600 | |
| Jun 2019 | 8CS | 2,366 sf | $1,150,000 | ✓ |
| May 2019 | 7BS | 2,523 sf | $1,000,000 | ✓ |
| Mar 2019 | 9ES | 2,281 sf | $480,300 | |
| Feb 2019 | 3FN | 1,670 sf | $570,000 | ✓ |
| Aug 2018 | 5GS | 1,670 sf | $835,000 | ✓ |
| Feb 2018 | 10GN | 1,670 sf | $935,000 | ✓ |
| Nov 2017 | 9CN | 2,366 sf | $1,690,000 | ✓ |
| Feb 2017 | 8AN | 2,052 sf | $2,250,000 | ✓ |
| Jan 2017 | 8ES | 2,281 sf | $1,050,000 | |
| Nov 2016 | 4CS | 2,366 sf | $1,400,000 | ✓ |
| Jul 2016 | C | 510 sf | $390,000 | ✓ |
| May 2016 | 7AS | 2,052 sf | $1,780,000 | ✓ |
| Apr 2016 | 5DN | 1,889 sf | $1,220,000 | ✓ |
| Apr 2016 | 4GS | 1,670 sf | $786,000 | ✓ |
| Jun 2015 | 6CS | 2,366 sf | $1,450,000 | ✓ |
| Jun 2015 | 4ES | 2,281 sf | $1,240,000 | ✓ |
| Jun 2015 | 10FN | 1,670 sf | $940,000 | ✓ |
| May 2015 | 10BN | 2,523 sf | $1,550,000 | ✓ |
| Mar 2015 | 10GN | 1,670 sf | $890,000 | ✓ |
| Dec 2014 | 3GN | 1,670 sf | $790,000 | ✓ |
| Dec 2014 | 3ES | 2,281 sf | $1,300,000 | ✓ |
| Oct 2014 | 4DN | 1,889 sf | $1,010,000 | ✓ |
| Aug 2014 | 6GS | 1,670 sf | $950,000 | ✓ |
| Aug 2014 | 7DN | 1,889 sf | $1,365,000 | ✓ |
| Mar 2014 | 8BS | 2,523 sf | $1,235,000 | ✓ |
| Nov 2013 | 6GN | 1,670 sf | $540,000 | ✓ |
| Jul 2013 | 3BS | 2,523 sf | $1,145,000 | ✓ |
| Jun 2013 | 6DN | 1,889 sf | $1,100,000 | ✓ |
| May 2013 | 11DN | 1,889 sf | $1,075,000 | ✓ |
| Feb 2013 | 4BN | 2,523 sf | $1,200,000 | ✓ |
| Dec 2012 | 6GN | 1,670 sf | $10,100 | |
| Dec 2012 | 11B-N | 3,711 sf | $1,795,000 | ✓ |
| Nov 2012 | 3ES | 2,281 sf | $990,000 | ✓ |
| Oct 2012 | 8CS | 2,366 sf | $208,500 | |
| Oct 2012 | 4FN | 1,670 sf | $650,000 | ✓ |
| Aug 2012 | 4GN | 1,670 sf | $625,000 | ✓ |
| Aug 2012 | 3BS | 2,523 sf | $812,400 | |
| May 2012 | 7FS | 1,670 sf | $695,000 | ✓ |
| Apr 2012 | 10FN | 1,670 sf | $673,000 | ✓ |
| Dec 2011 | 7DS | 1,889 sf | $840,000 | ✓ |
| Aug 2011 | 3FN | 1,670 sf | $530,000 | ✓ |
| Apr 2011 | 6DS | 1,889 sf | $740,000 | ✓ |
| Sep 2010 | 11GS | 1,670 sf | $545,000 | ✓ |
| Jul 2010 | 11DS | 1,889 sf | $650,000 | ✓ |
| May 2010 | 7FN | 1,888 sf | $575,000 | ✓ |
| Jan 2010 | B | 550 sf | $215,000 | ✓ |
| Oct 2009 | 6BN | 2,523 sf | $1,105,000 | ✓ |
| Oct 2008 | 6GS | 1,670 sf | $336,513 | |
| Oct 2008 | 7FS | 1,670 sf | $695,000 | ✓ |
| Oct 2008 | 7DS | 1,889 sf | $760,000 | ✓ |
| Sep 2008 | 5GN | 1,670 sf | $560,000 | |
| Apr 2008 | 10FN | 1,670 sf | $677,500 | ✓ |
| Jan 2008 | 11B-N | 3,711 sf | $1,750,000 | ✓ |
| Nov 2007 | 6FS | 1,670 sf | $600,000 | ✓ |
| Aug 2007 | 10GN | 1,670 sf | $628,500 | ✓ |
| Jun 2007 | 7EN | 2,281 sf | $1,370,000 | ✓ |
| Jun 2007 | 6AS | 2,052 sf | $1,800,000 | ✓ |
| May 2007 | 10GN | 1,670 sf | $628,500 | ✓ |
| Apr 2007 | 10ES | 2,281 sf | $1,150,000 | ✓ |
| Mar 2007 | 5AS | 2,552 sf | $1,775,000 | ✓ |
| Nov 2006 | C | 144 sf | $2,175,000 | ✓ |
| Nov 2006 | 11AN | 3,158 sf | $2,175,000 | ✓ |
| Jul 2006 | 6GS | 1,670 sf | $760,000 | ✓ |
| May 2006 | 4ES | 2,281 sf | $1,275,000 | ✓ |
| May 2006 | 3ES | 2,281 sf | $1,200,000 | ✓ |
| Apr 2006 | 3BS | 2,523 sf | $1,360,000 | ✓ |
| Mar 2006 | 8CN | 2,366 sf | $1,725,000 | ✓ |
| Jan 2006 | 6AS | 2,052 sf | $1,375,000 | ✓ |
| Dec 2005 | 6FN | 1,670 sf | $350,000 | ✓ |
| Nov 2005 | 5GN | 1,670 sf | $700,000 | ✓ |
| Sep 2005 | 7ES | 2,281 sf | $1,280,000 | ✓ |
| Sep 2005 | 11BS | 2,523 sf | $1,325,000 | ✓ |
| Aug 2005 | 4GS | 1,670 sf | $717,500 | ✓ |
| Jul 2005 | 7FS | 1,670 sf | $725,000 | ✓ |
| Jun 2005 | 6AS | 2,052 sf | $1,237,000 | ✓ |
| Mar 2005 | 4GN | 1,670 sf | $540,000 | ✓ |
| Dec 2004 | C | 144 sf | $2,000,000 | ✓ |
| Dec 2004 | 11DS | 1,889 sf | $610,000 | ✓ |
| Dec 2004 | 11B-N | 3,711 sf | $2,000,000 | ✓ |
| Dec 2004 | 11AN | 3,158 sf | $2,000,000 | ✓ |
| Dec 2004 | 8AN | 2,052 sf | $1,300,000 | ✓ |
| Oct 2004 | 10GS | 1,670 sf | $582,500 | ✓ |
| Oct 2004 | 10DS | 1,889 sf | $630,000 | ✓ |
| Oct 2004 | 6DN | 1,889 sf | $785,000 | ✓ |
| Aug 2004 | 10FN | 1,670 sf | $580,000 | ✓ |
| Aug 2004 | 7AS | 2,052 sf | $1,050,000 | ✓ |
| Aug 2004 | 5AS | 2,552 sf | $863,000 | ✓ |
| Jul 2004 | 8GN | 1,670 sf | $440,000 | ✓ |
| Jun 2004 | B | 112 sf | $440,000 | ✓ |
| Jun 2004 | 6GS | 1,670 sf | $482,500 | ✓ |
| Jun 2004 | 4GS | 1,670 sf | $440,000 | ✓ |
| Nov 2003 | 7CS | 2,366 sf | $610,000 | ✓ |
| Oct 2003 | 4GN | 1,670 sf | $365,000 | ✓ |
| Oct 2003 | 7DN | 1,889 sf | $710,000 | ✓ |
| Oct 2003 | 5BS | 2,523 sf | $550,000 | ✓ |
| Sep 2003 | 10GN | 1,670 sf | $425,000 | ✓ |
| Sep 2003 | 3FN | 1,670 sf | $382,500 | |
| Aug 2003 | 10GN | 1,670 sf | $287,830 | ✓ |
| Aug 2003 | 6GN | 1,670 sf | $420,000 | ✓ |
| Jul 2003 | 9GN | 1,670 sf | $509,000 | ✓ |
| Jun 2003 | 10GS | 1,670 sf | $431,650 | ✓ |
| Jun 2003 | 10FS | 1,670 sf | $407,000 | ✓ |
| May 2003 | 6FS | 1,670 sf | $389,000 | ✓ |
| Feb 2003 | 7CS | 2,366 sf | $590,000 | ✓ |
| Feb 2003 | 5AN | 2,052 sf | $899,000 | ✓ |
| Jan 2003 | 8CS | 2,366 sf | $625,000 | ✓ |
| Dec 2002 | 6GS | 1,670 sf | $395,000 | ✓ |
| Dec 2002 | 10FN | 1,670 sf | $487,500 | ✓ |
| Dec 2002 | 6AN | 2,052 sf | $999,000 | ✓ |
| Nov 2002 | 7EN | 2,281 sf | $660,000 | ✓ |
| Oct 2002 | 3DN | 1,889 sf | $540,000 | ✓ |
| Oct 2002 | 4AS | 2,052 sf | $780,000 | ✓ |
| Sep 2002 | C | 510 sf | $275,000 | ✓ |
| Sep 2002 | A | 960 sf | $395,000 | ✓ |
| Sep 2002 | 4FS | 1,670 sf | $314,000 | ✓ |
| Sep 2002 | 7BS | 2,523 sf | $590,000 | ✓ |
| May 2002 | 4FN | 1,670 sf | $396,300 | ✓ |
| Jan 2002 | 5ES | 2,281 sf | $595,000 | ✓ |
| Dec 2001 | 8GN | 1,670 sf | $325,000 | ✓ |
| Dec 2001 | 7GN | 1,670 sf | $185,000 | ✓ |
| Aug 2001 | 10FN | 1,670 sf | $380,000 | ✓ |
| Aug 2001 | 7FN | 1,888 sf | $420,000 | ✓ |
| Apr 2001 | 4FS | 1,670 sf | $320,000 | ✓ |
| Apr 2001 | 10DS | 1,889 sf | $465,000 | ✓ |
| Mar 2001 | B | 112 sf | $275,000 | ✓ |
| Mar 2001 | 4GS | 1,670 sf | $275,000 | ✓ |
| Mar 2001 | 8EN | 2,281 sf | $850,000 | ✓ |
| Mar 2001 | 11CS | 2,366 sf | $545,000 | ✓ |
| Jan 2001 | 6CS | 2,366 sf | $570,000 | ✓ |
| Oct 2000 | 9DN | 1,889 sf | $515,000 | ✓ |
| Sep 2000 | 5ES | 2,281 sf | $580,000 | ✓ |
| Sep 2000 | 10CS | 2,366 sf | $478,000 | ✓ |
| Jul 2000 | 3DN | 1,889 sf | $400,000 | ✓ |
| Jul 2000 | 8CS | 2,366 sf | $515,000 | ✓ |
| Jun 2000 | 9GN | 1,670 sf | $290,000 | ✓ |
| Jun 2000 | 6FS | 1,670 sf | $317,500 | ✓ |
| Jun 2000 | 3BS | 2,523 sf | $480,000 | ✓ |
| Mar 2000 | 3GN | 1,670 sf | $258,000 | ✓ |
| Mar 2000 | 7BN | 2,686 sf | $650,000 | ✓ |
| Feb 2000 | B | 550 sf | $230,000 | ✓ |
| Feb 2000 | 10FS | 1,670 sf | $340,000 | ✓ |
| Jan 2000 | 9EN | 2,281 sf | $599,000 | ✓ |
| Dec 1999 | 6AS | 2,052 sf | $684,800 | ✓ |
| Aug 1999 | 5GS | 1,670 sf | $300,000 | ✓ |
| Jul 1999 | 3FN | 1,670 sf | $250,000 | ✓ |
| Jul 1999 | 6CN | 2,366 sf | $570,000 | ✓ |
| May 1999 | 3CN | 2,366 sf | $505,000 | ✓ |
| Nov 1998 | 9CS | 2,366 sf | $575,000 | ✓ |
| Oct 1998 | 8CN | 2,366 sf | $635,000 | ✓ |
| Aug 1998 | 7FN | 1,888 sf | $349,000 | ✓ |
| Jul 1998 | 10FN | 1,670 sf | $350,000 | ✓ |
| Jul 1998 | 7AN | 2,052 sf | $664,500 | ✓ |
| Jun 1998 | 6EN | 2,281 sf | $660,000 | ✓ |
| Jun 1998 | 7BS | 2,523 sf | $505,000 | ✓ |
| Apr 1998 | 4DS | 1,889 sf | $350,000 | ✓ |
| Dec 1997 | 3DS | 1,889 sf | $337,500 | ✓ |
| Dec 1997 | 6AN | 2,052 sf | $750,000 | ✓ |
| Nov 1997 | 9BS | 2,523 sf | $525,833 | ✓ |
| Oct 1997 | 10GS | 1,670 sf | $260,000 | ✓ |
| Sep 1997 | 6BN | 2,523 sf | $650,000 | ✓ |
| Jul 1997 | A | 144 sf | $17,000 | ✓ |
| Jul 1997 | 3AN | 2,052 sf | $783,000 | ✓ |
| May 1997 | 3EN | 2,281 sf | $375,000 | ✓ |
| Apr 1997 | B1 | 112 sf | $12,000 | ✓ |
| Apr 1997 | 5DS | 1,889 sf | $360,000 | ✓ |
| Apr 1997 | 11BS | 2,523 sf | $535,000 | ✓ |
| Mar 1997 | 6FN | 1,670 sf | $250,000 | ✓ |
| Feb 1997 | 11GN | 3,340 sf | $500,000 | ✓ |
| Jan 1997 | 9CN | 2,366 sf | $560,000 | ✓ |
| Dec 1996 | 10DS | 1,889 sf | $395,500 | ✓ |
| Sep 1996 | 6EN | 2,281 sf | $637,500 | ✓ |
| Sep 1996 | 10DN | 1,889 sf | $480,000 | ✓ |
| Jul 1996 | 4CN | 2,366 sf | $505,000 | |
| Apr 1996 | 7CS | 2,366 sf | $500,000 | ✓ |
| Jan 1996 | 4AN | 2,052 sf | $700,000 | ✓ |
| Sep 1995 | 11FS | 1,670 sf | $340,000 | ✓ |
| Sep 1995 | 7EN | 2,281 sf | $645,000 | ✓ |
| Aug 1995 | 4ES | 2,281 sf | $550,000 | ✓ |
| Jul 1995 | 3CN | 2,366 sf | $610,000 | ✓ |
| Jul 1995 | 3CN | 2,366 sf | $810,000 | ✓ |
| Mar 1995 | 5FN | 1,670 sf | $285,000 | ✓ |
| Dec 1994 | 3FN | 1,670 sf | $230,000 | ✓ |
| Oct 1994 | 9ES | 2,281 sf | $470,000 | ✓ |
| Sep 1994 | 8FN | 1,670 sf | $297,500 | ✓ |
| Aug 1994 | 5GS | 1,670 sf | $255,000 | ✓ |
| Jul 1994 | 7FS | 1,670 sf | $255,000 | ✓ |
| Jul 1994 | 8DN | 1,889 sf | $511,300 | ✓ |
| May 1994 | 5DS | 1,889 sf | $450,000 | ✓ |
| Apr 1994 | 11CS | 2,366 sf | $527,500 | ✓ |
| Feb 1994 | 5FS | 1,670 sf | $247,500 | ✓ |
| Jan 1994 | 11BS | 2,523 sf | $580,000 | ✓ |
| Oct 1993 | 11CS | 2,366 sf | $387,000 | ✓ |
| Sep 1993 | 7GS | 1,670 sf | $280,000 | ✓ |
| Sep 1993 | 10BN | 2,523 sf | $900,000 | ✓ |
| Jun 1993 | 4FN | 1,670 sf | $250,000 | ✓ |
| Jun 1993 | 9DN | 1,889 sf | $450,000 | ✓ |
| Jun 1993 | 6AS | 2,052 sf | $635,000 | ✓ |
| Apr 1993 | 7FN | 1,888 sf | $250,000 | ✓ |
| Mar 1993 | 5BN | 2,523 sf | $682,500 | ✓ |
| Feb 1993 | 10BS | 2,523 sf | $500,000 | ✓ |
| Jan 1993 | 6CS | 2,366 sf | $360,000 | |
| Nov 1992 | 9EN | 2,281 sf | $675,000 | ✓ |
| Aug 1992 | 5AN | 2,052 sf | $525,000 | ✓ |
| Jul 1992 | 11FS | 1,670 sf | $220,000 | ✓ |
| Jun 1992 | 8CS | 2,366 sf | $500,000 | ✓ |
| Feb 1992 | 5GS | 1,670 sf | $215,000 | ✓ |
| Jan 1992 | 8GS | 1,670 sf | $236,000 | ✓ |
| Dec 1991 | 10EN | 2,281 sf | $670,000 | ✓ |
| Sep 1991 | 9FN | 1,670 sf | $280,000 | ✓ |
| Jun 1991 | 6EN | 2,281 sf | $637,500 | ✓ |
| Feb 1991 | 11GN | 3,340 sf | $550,000 | ✓ |
| Jan 1991 | 7EN | 2,281 sf | $762,000 | |
| Dec 1990 | 3CN | 2,366 sf | $700,000 | |
| Oct 1990 | 9FS | 1,670 sf | $300,000 | ✓ |
| Aug 1990 | 7EN | 2,281 sf | $750,000 | ✓ |
| Jul 1990 | 7BN | 2,686 sf | $540,000 | ✓ |
| May 1990 | 5GN | 1,670 sf | $245,000 | ✓ |
| Aug 1989 | A | 960 sf | $325,000 | ✓ |
| Aug 1989 | 6AN | 2,052 sf | $800,000 | ✓ |
| Jun 1989 | C | 510 sf | $2,250,000 | ✓ |
| Jun 1989 | C | 144 sf | $2,250,000 | ✓ |
| Jun 1989 | 3ES | 2,281 sf | $450,000 | ✓ |
| Jun 1989 | 11AN | 3,158 sf | $2,250,000 | ✓ |
| Feb 1989 | 10FS | 1,670 sf | $240,000 | ✓ |
| Jan 1989 | 8BN | 2,523 sf | $520,000 | ✓ |
| Nov 1988 | 10DS | 1,889 sf | $300,000 | ✓ |
| Jul 1988 | 11DN | 1,889 sf | $370,000 | ✓ |
| Jun 1988 | 10CS | 2,366 sf | $350,000 | ✓ |
| May 1988 | 11GN | 3,340 sf | $450,000 | ✓ |
| Jan 1988 | 10ES | 2,281 sf | $380,000 | ✓ |
| Dec 1987 | 3GN | 1,670 sf | $144,500 | ✓ |
| Nov 1987 | 10FS | 1,670 sf | $170,000 | ✓ |
| Nov 1987 | 10BS | 2,523 sf | $285,000 | ✓ |
| Aug 1987 | 8AS | 2,052 sf | $415,000 | ✓ |
| Jul 1987 | 4ES | 2,281 sf | $310,000 | ✓ |
| Jun 1987 | 7FS | 1,670 sf | $180,000 | ✓ |
| Jun 1987 | 5FS | 1,670 sf | $138,500 | ✓ |
| May 1987 | 7EN | 2,281 sf | $355,000 | ✓ |
| May 1987 | 7BS | 2,523 sf | $300,000 | ✓ |
| May 1987 | 10BN | 2,523 sf | $397,000 | ✓ |
| Mar 1987 | 5CS | 2,366 sf | $270,000 | ✓ |
| Jan 1987 | 10ES | 2,281 sf | $265,000 | ✓ |
| Jan 1987 | 5BN | 2,523 sf | $297,000 | ✓ |
| Jan 1987 | 3AS | 2,052 sf | $351,000 | ✓ |
| Dec 1986 | 11ES | 2,281 sf | $210,000 | ✓ |
| Dec 1986 | 8EN | 2,281 sf | $342,500 | ✓ |
| Nov 1986 | 5FN | 1,670 sf | $145,000 | |
| Jul 1986 | 9FS | 1,670 sf | $190,000 | ✓ |
| Jun 1986 | 6BN | 2,523 sf | $295,000 | ✓ |
| May 1986 | 9BN | 2,523 sf | $285,000 | ✓ |
| Apr 1986 | 6AN | 2,052 sf | $520,000 | ✓ |
| Feb 1986 | 6FS | 1,670 sf | $165,000 | ✓ |
| Jan 1986 | 4CN | 2,366 sf | $290,000 | ✓ |
| Jan 1986 | 8AN | 2,052 sf | $360,000 | ✓ |
| Dec 1985 | C | 510 sf | $575,000 | ✓ |
| Dec 1985 | C | 144 sf | $575,000 | ✓ |
| Dec 1985 | 8FN | 1,670 sf | $150,000 | ✓ |
| Sep 1985 | 9DS | 1,889 sf | $245,000 | ✓ |
| Aug 1985 | 8EN | 2,281 sf | $285,000 | ✓ |
| Jul 1985 | 4AN | 2,052 sf | $319,000 | |
| Jun 1985 | 8CN | 2,366 sf | $288,600 | |
| Jun 1985 | 3AS | 2,052 sf | $298,000 | ✓ |
| May 1985 | 4FN | 1,670 sf | $150,000 | ✓ |
| Mar 1985 | 9EN | 2,281 sf | $300,000 | ✓ |
| Feb 1985 | 11CN | 2,366 sf | $350,000 | ✓ |
| Sep 1984 | 11CN | 2,366 sf | $342,500 | ✓ |
| Jul 1984 | 5GN | 1,670 sf | $150,000 | |
| May 1984 | 6FS | 1,670 sf | $225,000 | |
| Apr 1984 | 8GS | 1,670 sf | $140,000 | |
| Mar 1984 | 11BS | 2,523 sf | $290,000 | |
| Mar 1983 | 9GS | 1,670 sf | $190,000 | ✓ |
| Mar 1983 | 4AN | 2,052 sf | $430,000 | ✓ |
| Jan 1983 | 10AN | 4,104 sf | $820,000 | ✓ |
| Jan 1982 | 7CN | 2,366 sf | $375,000 | ✓ |
| Nov 1981 | 5FN | 1,670 sf | $215,000 | ✓ |
| Oct 1981 | 11DN | 1,889 sf | $360,000 | ✓ |
| Sep 1981 | 7BN | 2,686 sf | $355,000 | ✓ |
| Aug 1981 | 6DS | 1,889 sf | $360,000 | ✓ |
| Jul 1981 | 11DN | 1,889 sf | $360,000 | ✓ |
| Jun 1981 | 11FS | 1,670 sf | $205,000 | ✓ |
| May 1981 | 11GN | 3,340 sf | $275,000 | ✓ |
| May 1981 | 8BN | 2,523 sf | $500,000 | |
| Feb 1981 | 6AS | 2,052 sf | $400,000 | ✓ |
| Dec 1980 | 5FN | 1,670 sf | $219,000 | ✓ |
| Dec 1980 | 8CN | 2,366 sf | $445,000 | ✓ |
| Nov 1980 | 6FN | 1,670 sf | $225,000 | ✓ |
| Nov 1980 | 6ES | 2,281 sf | $310,000 | ✓ |
| Nov 1980 | 5ES | 2,281 sf | $335,000 | ✓ |
| Nov 1980 | 6AS | 2,052 sf | $382,000 | ✓ |
| Jun 1980 | 11DN | 1,889 sf | $400,000 | ✓ |
| Jun 1980 | 10CS | 2,366 sf | $350,000 | ✓ |
| Apr 1980 | 7BS | 2,523 sf | $370,000 | ✓ |
| Mar 1980 | 6FN | 1,670 sf | $170,000 | ✓ |
| Feb 1980 | 8AN | 2,052 sf | $375,000 | ✓ |
| Jan 1980 | 7BN | 2,686 sf | $350,000 | ✓ |
| Nov 1979 | 3EN | 2,281 sf | $320,000 | ✓ |
| Oct 1979 | 4GN | 1,670 sf | $220,000 | ✓ |
| Oct 1979 | 9ES | 2,281 sf | $350,000 | ✓ |
| Oct 1979 | 8DS | 1,889 sf | $270,000 | ✓ |
| Aug 1979 | 9GS | 1,670 sf | $190,000 | ✓ |
| Aug 1979 | 5FN | 1,670 sf | $170,000 | ✓ |
| Jul 1979 | 6AN | 2,052 sf | $350,000 | ✓ |
| Jun 1979 | 6EN | 2,281 sf | $285,000 | ✓ |
| Feb 1979 | 11CN | 2,366 sf | $300,000 | ✓ |
| Feb 1979 | 11BS | 2,523 sf | $350,000 | ✓ |
| Jan 1979 | 11ES | 2,281 sf | $200,000 | ✓ |
| Dec 1978 | 5BN | 2,523 sf | $220,000 | ✓ |
| Oct 1978 | 10FS | 1,670 sf | $192,333 | ✓ |
| Oct 1978 | 6FS | 1,670 sf | $150,000 | ✓ |
| Aug 1978 | 5BN | 2,523 sf | $207,000 | ✓ |
| Aug 1978 | 3BN | 2,523 sf | $291,000 | ✓ |
| Jun 1978 | 10FS | 1,670 sf | $128,000 | ✓ |
| Jun 1978 | 4DS | 1,889 sf | $175,100 | ✓ |
| Jun 1978 | 10BN | 2,523 sf | $230,000 | ✓ |
| Apr 1978 | 4FS | 1,670 sf | $149,000 | ✓ |
| Apr 1978 | 9FN | 1,670 sf | $115,000 | ✓ |
| Apr 1978 | 9FN | 1,670 sf | $130,000 | ✓ |
| Apr 1978 | 10DN | 1,889 sf | $185,000 | ✓ |
| Mar 1978 | 10DS | 1,889 sf | $200,000 | ✓ |
| Feb 1978 | 3EN | 2,281 sf | $179,800 | ✓ |
| Jan 1978 | 9FS | 1,670 sf | $154,000 | ✓ |
| Jan 1978 | 9FN | 1,670 sf | $70,000 | ✓ |
| Jan 1978 | 8EN | 2,281 sf | $180,000 | ✓ |
| Jan 1978 | 8AN | 2,052 sf | $255,000 | ✓ |
| Jan 1978 | 4AN | 2,052 sf | $235,000 | ✓ |
| Nov 1977 | 7FS | 1,670 sf | $112,000 | ✓ |
| Oct 1977 | 10DS | 1,889 sf | $100,000 | ✓ |
| Oct 1977 | 5AS | 2,552 sf | $97,300 | ✓ |
| Sep 1977 | 4FS | 1,670 sf | $110,000 | ✓ |
| Jun 1977 | 5BS | 2,523 sf | $162,000 | |
| May 1977 | 7DS | 1,889 sf | $130,000 | ✓ |
| Apr 1977 | 7FS | 1,670 sf | $100,000 | ✓ |
| Apr 1977 | 7ES | 2,281 sf | $162,000 | ✓ |
| Apr 1977 | 3EN | 2,281 sf | $142,800 | ✓ |
| Mar 1977 | 9FS | 1,670 sf | $107,000 | ✓ |
| Mar 1977 | 3FS | 1,670 sf | $100,300 | ✓ |
| Mar 1977 | 5BS | 2,523 sf | $162,000 | ✓ |
| Feb 1977 | 8GS | 1,670 sf | $126,500 | ✓ |
| Jan 1977 | 8GS | 1,670 sf | $115,000 | ✓ |
| Jan 1977 | 9AN | 2,052 sf | $250,000 | ✓ |
| Dec 1976 | 7GN | 1,670 sf | $118,000 | ✓ |
| Dec 1976 | 9BS | 2,523 sf | $160,000 | ✓ |
| Nov 1976 | 11EN | 2,281 sf | $200,000 | ✓ |
| Oct 1976 | 4BS | 2,523 sf | $133,000 | ✓ |
| Sep 1976 | 7GN | 1,670 sf | $90,000 | ✓ |
| Sep 1976 | 11DS | 1,889 sf | $155,000 | ✓ |
| Sep 1976 | 5DS | 1,889 sf | $139,000 | ✓ |
| Aug 1976 | 4GN | 1,670 sf | $61,000 | |
| Aug 1976 | 4DS | 1,889 sf | $105,000 | ✓ |
| Aug 1976 | 9CN | 2,366 sf | $78,300 | ✓ |
| Jul 1976 | A | 960 sf | $16,800 | ✓ |
| Jul 1976 | 3GS | 1,670 sf | $124,000 | ✓ |
| Jul 1976 | 6FN | 1,670 sf | $60,000 | |
| Jul 1976 | 9CS | 2,366 sf | $149,000 | ✓ |
| Jun 1976 | 3GN | 1,670 sf | $80,000 | ✓ |
| Jun 1976 | 5ES | 2,281 sf | $139,000 | ✓ |
| Jun 1976 | 3ES | 2,281 sf | $141,900 | ✓ |
| May 1976 | 4GN | 1,670 sf | $77,000 | ✓ |
| May 1976 | 10ES | 2,281 sf | $153,000 | ✓ |
| May 1976 | 4ES | 2,281 sf | $138,000 | ✓ |
| May 1976 | 3BS | 2,523 sf | $140,000 | ✓ |
| Apr 1976 | 4GS | 1,670 sf | $70,000 | ✓ |
| Apr 1976 | 3GS | 1,670 sf | $80,000 | ✓ |
| Apr 1976 | 5GN | 1,670 sf | $82,000 | ✓ |
| Apr 1976 | 5FS | 1,670 sf | $79,000 | ✓ |
| Apr 1976 | 3FS | 1,670 sf | $77,000 | ✓ |
| Apr 1976 | 4FN | 1,670 sf | $78,000 | ✓ |
| Apr 1976 | 3CS | 2,366 sf | $130,000 | ✓ |
| Mar 1976 | 10ES | 2,281 sf | $137,000 | ✓ |
| Mar 1976 | 6ES | 2,281 sf | $133,000 | ✓ |
| Mar 1976 | 5ES | 2,281 sf | $132,000 | ✓ |
| Mar 1976 | 4ES | 2,281 sf | $131,000 | ✓ |
| Mar 1976 | 3ES | 2,281 sf | $130,000 | ✓ |
| Mar 1976 | 5BS | 2,523 sf | $139,000 | ✓ |
| Mar 1976 | 3BS | 2,523 sf | $135,000 | ✓ |
| Feb 1976 | 4FS | 1,670 sf | $74,100 | ✓ |
| Feb 1976 | 4EN | 2,281 sf | $136,000 | ✓ |
| Feb 1976 | 7BS | 2,523 sf | $137,300 | ✓ |
| Jan 1976 | 9GS | 1,670 sf | $86,000 | ✓ |
| Jan 1976 | 5GS | 1,670 sf | $82,000 | ✓ |
| Jan 1976 | 5DS | 1,889 sf | $108,000 | ✓ |
| Jan 1976 | 8DN | 1,889 sf | $109,000 | ✓ |
| Jan 1976 | 11BS | 2,523 sf | $146,000 | ✓ |
| Jan 1976 | 10BS | 2,523 sf | $139,000 | ✓ |
| Jan 1976 | 8BS | 2,523 sf | $140,000 | ✓ |
| Dec 1975 | 3DN | 1,889 sf | $110,100 | ✓ |
| Dec 1975 | 11CS | 2,366 sf | $133,000 | ✓ |
| Nov 1975 | 7GS | 1,670 sf | $80,000 | ✓ |
| Nov 1975 | 7FN | 1,888 sf | $81,000 | ✓ |
| Nov 1975 | 8ES | 2,281 sf | $135,600 | ✓ |
| Nov 1975 | 7CS | 2,366 sf | $128,000 | ✓ |
| Nov 1975 | 6CS | 2,366 sf | $129,000 | ✓ |
| Nov 1975 | 9BS | 2,523 sf | $141,000 | ✓ |
| Nov 1975 | 7AS | 2,052 sf | $148,000 | ✓ |
| Oct 1975 | 6GS | 1,670 sf | $79,000 | ✓ |
| Oct 1975 | 6GN | 1,670 sf | $76,000 | ✓ |
| Oct 1975 | 3FN | 1,670 sf | $75,000 | ✓ |
| Oct 1975 | 9ES | 2,281 sf | $137,000 | ✓ |
| Oct 1975 | 5CS | 2,366 sf | $126,000 | ✓ |
| Oct 1975 | 3CS | 2,366 sf | $124,000 | ✓ |
| Sep 1975 | 8FS | 1,670 sf | $82,000 | ✓ |
| Sep 1975 | 7ES | 2,281 sf | $100,667 | ✓ |
| Sep 1975 | 10CN | 2,366 sf | $155,000 | ✓ |
| Sep 1975 | 3BN | 2,523 sf | $149,000 | ✓ |
| Aug 1975 | 5EN | 2,281 sf | $144,000 | ✓ |
| Aug 1975 | 3DS | 1,889 sf | $100,000 | ✓ |
| Aug 1975 | 9AS | 2,052 sf | $165,000 | ✓ |
| Jul 1975 | C | 510 sf | $16,800 | ✓ |
| Jul 1975 | B | 550 sf | $16,800 | ✓ |
| Jul 1975 | 11EN | 2,281 sf | $151,000 | ✓ |
| Jul 1975 | 10CS | 2,366 sf | $131,000 | ✓ |
| Jul 1975 | 6CN | 2,366 sf | $146,000 | ✓ |
| Jul 1975 | 3AN | 2,052 sf | $95,900 | ✓ |
| Jun 1975 | 11GS | 1,670 sf | $89,000 | ✓ |
| Jun 1975 | 11ES | 2,281 sf | $142,000 | ✓ |
| Jun 1975 | 6EN | 2,281 sf | $139,300 | ✓ |
| Jun 1975 | 6DS | 1,889 sf | $104,000 | ✓ |
| Jun 1975 | 9DN | 1,889 sf | $115,000 | ✓ |
| Jun 1975 | 4DN | 1,889 sf | $105,000 | ✓ |
| Jun 1975 | 10BN | 2,523 sf | $147,000 | ✓ |
| Jun 1975 | 5AN | 2,052 sf | $163,500 | ✓ |
| May 1975 | 11DS | 1,889 sf | $108,000 | ✓ |
| May 1975 | 7DN | 1,889 sf | $108,000 | ✓ |
| May 1975 | 9CS | 2,366 sf | $124,000 | ✓ |
| May 1975 | 8CN | 2,366 sf | $132,000 | ✓ |
| May 1975 | 6BN | 2,523 sf | $143,000 | ✓ |
| May 1975 | 9AS | 2,052 sf | $143,000 | ✓ |
| Apr 1975 | 10EN | 2,281 sf | $145,000 | ✓ |
| Apr 1975 | 6DN | 1,889 sf | $107,000 | ✓ |
| Apr 1975 | 3DN | 1,889 sf | $109,000 | ✓ |
| Apr 1975 | 9CN | 2,366 sf | $129,000 | ✓ |
| Apr 1975 | 5CN | 2,366 sf | $125,000 | ✓ |
| Apr 1975 | 4CN | 2,366 sf | $124,000 | ✓ |
| Apr 1975 | 5BN | 2,523 sf | $142,000 | ✓ |
| Mar 1975 | 11AS | 2,052 sf | $150,000 | ✓ |
| Mar 1975 | 4AS | 2,052 sf | $100,000 | ✓ |
| Feb 1975 | 10FS | 1,670 sf | $80,000 | ✓ |
| Feb 1975 | 7FN | 1,888 sf | $77,000 | ✓ |
| Feb 1975 | 7EN | 2,281 sf | $139,000 | ✓ |
| Feb 1975 | 7DS | 1,889 sf | $103,000 | ✓ |
| Feb 1975 | 8CS | 2,366 sf | $123,000 | ✓ |
| Feb 1975 | 6CN | 2,366 sf | $126,000 | ✓ |
| Feb 1975 | 6AS | 2,052 sf | $140,000 | ✓ |
| Feb 1975 | 5AS | 2,552 sf | $139,000 | ✓ |
| Feb 1975 | 10AN | 4,104 sf | $144,000 | ✓ |
| Feb 1975 | 9AN | 2,052 sf | $143,000 | ✓ |
| Jan 1975 | 11GN | 3,340 sf | $85,000 | ✓ |
| Jan 1975 | 8GN | 1,670 sf | $60,800 | ✓ |
| Jan 1975 | 11FS | 1,670 sf | $82,000 | ✓ |
| Jan 1975 | 7FS | 1,670 sf | $77,000 | ✓ |
| Jan 1975 | 10FN | 1,670 sf | $80,000 | ✓ |
| Jan 1975 | 8FN | 1,670 sf | $78,000 | ✓ |
| Jan 1975 | 9EN | 2,281 sf | $141,000 | ✓ |
| Jan 1975 | 8EN | 2,281 sf | $140,000 | ✓ |
| Jan 1975 | 4CS | 2,366 sf | $119,000 | ✓ |
| Jan 1975 | 7CN | 2,366 sf | $127,000 | ✓ |
| Jan 1975 | 3CN | 2,366 sf | $123,000 | ✓ |
| Jan 1975 | 9BN | 2,523 sf | $146,000 | ✓ |
| Jan 1975 | 8BN | 2,523 sf | $145,000 | ✓ |
| Jan 1975 | 4BN | 2,523 sf | $141,000 | ✓ |
| Jan 1975 | 8AS | 2,052 sf | $142,000 | ✓ |
| Jan 1975 | 4AS | 2,052 sf | $138,000 | ✓ |
| Jan 1975 | 3AS | 2,052 sf | $137,000 | ✓ |
| Dec 1974 | 10GS | 1,670 sf | $83,000 | ✓ |
| Dec 1974 | 10GN | 1,670 sf | $83,000 | ✓ |
| Dec 1974 | 9GN | 1,670 sf | $82,000 | ✓ |
| Dec 1974 | 7GN | 1,670 sf | $80,000 | ✓ |
| Dec 1974 | 9DS | 1,889 sf | $105,000 | ✓ |
| Dec 1974 | 8DS | 1,889 sf | $104,000 | ✓ |
| Dec 1974 | 10DN | 1,889 sf | $74,000 | ✓ |
| Dec 1974 | 5DN | 1,889 sf | $106,000 | ✓ |
| Dec 1974 | 10CN | 2,366 sf | $130,000 | ✓ |
| Dec 1974 | 6BS | 2,523 sf | $138,000 | ✓ |
| Dec 1974 | 7BN | 2,686 sf | $144,000 | ✓ |
| Dec 1974 | 7AN | 2,052 sf | $140,000 | ✓ |
| Dec 1974 | 6AN | 2,052 sf | $140,000 | ✓ |
✓ = qualified arms-length per the Miami-Dade Property Appraiser. 160 nominal-consideration paper transfers omitted.
This page reflects publicly available information compiled by The Roebling Research Desk. Specific building details should be confirmed with the association during due diligence; the recorded Declaration of Condominium, the current building budget, the current tax bill, the structural integrity reserve study and milestone-inspection status should be reviewed for any specific transaction. © 2026 The Roebling Team at Compass.
Considering a move at Mar-azul?
Request a private building brief with the relevant recorded sales, current and off-market availability, and an apartment-specific view of value.
646.939.7375 · c.cohen@compass.com
Building facts and sales records are compiled from Miami-Dade County public records (Property Appraiser) and reviewed against recognized architectural references. Figures are reported as recorded and may be updated as the county updates its records. This page is informational and is not an offer or solicitation. Apartment estimates are automated, from public records, and are not appraisals.
The Roebling Team at Compass is led by Corey Cohen, a New York licensed associate real estate broker. For a purchase or sale in Miami, we introduce you to a licensed Compass agent there by referral and handle the New York side of your move ourselves. This page and its calculators are research, not an offer of representation.
To plan a move between Manhattan and Miami, schedule a consultation; where appropriate we’ll introduce you to a vetted Compass agent in the local market.